Unscheduled network outage - 8-8:10 a.m. Saturday May 2nd, 2015

Date Posted: April 30, 2015

Please make note of the following interruption of electrical power.  All occupants of INSCC should shut down computers and other equipment before 8 am Saturday May 2nd, 2015.


From: FM Dispatch [dispatch@fm.utah.edu]
Sent: Wednesday, April 29, 2015 4:23 PM
To: Shutdown; 0001; 0002; 0003; 0004; 0009; 0010; 0011; 0012; 0013; 0019; 0040; 0043; 0053; 0056; 0057; 0058; 0059; 0061; 0062; 0063; 0064
Cc: Electrical Shutdowns ; Kevin Thomas
Subject: Electrical Interruption  To Buildings:  001/John R Park Bldg - 002/Voice & Opera Center - 003/David P Gardner Hall - 004/Joseph T. Kingsbury Hall - 009/John Widtsoe Bldg - Math - 010/Physics Building - 011/William C.Browning - 012/Fredrick Albert Sutto...

CAMPUS INTERRUPTION NOTICE

**UNPLANNED**


This is a notification of a unplanned interruption as a result of required service or repairs to equipment.

SYSTEM INTERRUPTED:

 Electrical To: 001/John R Park Bldg - 002/Voice & Opera Center - 003/David P Gardner Hall - 004/Joseph T. Kingsbury Hall - 009/John Widtsoe Bldg - Math - 010/Physics Building - 011/William C.Browning - 012/Fredrick Albert Sutton Building - 013/LeRoy E. Cowles Bldg - 019/Intermountain Network Scientific CC - 040/Student Servics Bldg - 043/Naval Science Bldg - 053/A. Ray Olpin Union Bldg   - 056/Civil and Materials Engineering - 057/Hedco Building - 058/Mineral Processing Lab - 059/Mining Syst Resrch Lab & Ivor Thomas Lab - 061/Floyd & Jeri Meldrum Civil Engineering Bldg - 062/John & Marva Warnock Engineering - 063/John & Marva Warock Engineering, L (old EMCB) - 064/ -

DATE:

 Saturday, May 2, 2015

TIME:

 8:00 A.M. until 8:10 A.M.

AREA AFFECTED:

 Electrical for entire building ie. parking lot lights, outlets, switches, fans, walkway lighting and elevators.

PURPOSE:

 Move load to medical substation.

REQUESTER:

 Facility Operations, Kevin Thomas, 7-8760


We regret any inconvenience caused by this interruption.  The time frame of this interruption is necessary to prevent further damage to equipment or a safety hazard to the building occupants.

Please notify all individuals on your staff who might be affected by this interruption.  They may need to make special arrangements to carry them over this period.